DOMESTIC HOUSEHOLDS · LT I-A · TWO-MONTH CYCLE
Understand your units.
See where the money goes.
A simple electricity energy-charge illustration, with the subsidy and every slab made visible. Independent of TNPDCL; not an official bill.
Current-rate calculation is unavailable
Loading tariff verification details. No current estimate will be shown.
GOVERNMENT FREE UNITS · DATED OFFICIAL EVIDENCE
The free-unit benefit depends on total consumption.
TNERC Order 5/2026, pages 1–4 implements Government Order (Ms) No.50: effective 10 May 2026, with provisional subsidy approved for the period through 31 March 2027.
For eligible domestic LT I-A services in the order; no cash credit or unused-unit carry-forward is assumed. Opt-out/ineligible services and mixed or prorated cycles are not supported.
Verified order content is not current eligibility verification. We have not established a complete current tariff/subsidy schedule or whether later directions modify these provisions. The calculator applies them only in its explicitly selected 10 May–30 June 2026 historical scenario, never as a guaranteed current entitlement.
YOUR CONSUMPTION
Calculate energy charges
No account number. No login. Your units stay in this browser.
Accuracy before a number.
We will not guess a current tariff. Select the clearly dated historical schedule to see how the calculation works.
HISTORICAL ENERGY ILLUSTRATION · NOT CURRENT
| Slab (kWh) | Units | Pay / unit | Amount |
|---|
- Total consumed units
- Government free units applied
- Chargeable units after free units
- Approved energy before subsidy
- Government energy subsidy
- Fixed charge (Order 6/2025)
- Nil
Energy only. Taxes or account charges are not calculated. Sub-paise products are summed before rounding once to paise; displayed rows can differ by one paise from their sum.
THE DETAIL THAT MATTERS
Crossing 500 changes earlier units, too.
In the reviewed May–June 2026 schedule, usage up to 500 kWh gets 200 free units. Above 500 kWh, only the first 100 are free; units 101–400 are payable at the higher-use rate. This is not one universal progressive table.
EVIDENCE & FRESHNESS
Know what has actually been checked.
This button reloads the last published monitoring result, not today's official rates. Official-site checks run daily at 07:47 IST (may be delayed). Repository maintainers can run an official-source check manually in GitHub Actions; this public page cannot start one.
Published status has not been loaded in this browser.
Loading monitoring status…
Monitoring cannot prove that no newer order exists.
View this monitoring run Daily check history
Primary tariff and subsidy evidence
Government Order (Ms) No.50, Energy Department, 10 May 2026, is expressly cited and implemented in TNERC Order 5/2026. A separate original GO copy has not been obtained. Historical evidence was cross-checked by a coding assistant; it is not human certification.
Extracted passages & SHA-256 provenance · Raw monitoring results · TNPDCL tariff index · TNERC tariff orders
An energy illustration, not your payable account bill.
For standard domestic household LT I-A connections only. Excludes arrears, delayed-payment charges, deposits, meter adjustments, taxes, solar/net metering, common-area supply, commercial connections, subsidy opt-out or ineligible services, and mixed-rate or prorated billing periods. We do not infer these from units. Check your assessment and subsidy eligibility with TNPDCL.
For your actual bill, use official TNPDCL services. This application does not collect connection IDs, passwords, or payments.